Catalog Advanced Search

198 item(s) were found using the following search criteria
  • Authors: Chand

Don't see what you're looking for? Modify your search

per page
  1. Indian Railways

    Authors: Ravichandran, N;

    Reference No: QM0203 Pages: 13 Published on: 1, January, 1985

    Abstract: Presents a problem the Indian Railways faces in deciding to introduce superfast trains. It illustrates the need for a simulation analysis in a complex situation. ... More

  2. Kalyan Engineering Corporation Limited

    Authors: Ravichandran, N;

    Reference No: QM0204 Pages: 7 Published on: 1, January, 1985

    Abstract: In this case, the guarantee period of an engineering product is to be determined considering several related factors. ... More

  3. Tobacco Board

    Authors: Ravichandran, N;

    Reference No: QM0233 Pages: 15 Published on: 1, January, 1993

    Abstract: The case presents the commercial activities related to the sale of tobacco in multiple locations of the same agency. The documents used and data generated are presented to facilitate computerization. The case focus on system analysis (and issues related to computerization). Adequate operational details of the Tobacco Board are presented. ... More

  4. Calcutta Cosmetic Company Limited **

    Authors: Balachandra, R;

    Reference No: PROD0036 Pages: 6 Published on: 1, January, 1966

    Abstract: The plant engineer proposes to set up an internal maintenance workshop. The case provides ample material to consider this proposal against the company's existing method of operations that is mostly contractual. ... More

  5. Tusker Automobiles Co. Ltd. **

    Authors: Balachandra, R;

    Reference No: PROD0037 Pages: 9 Published on: 1, January, 1966

    Abstract: Describes how a manufacturing organization plans to introduce preventive maintenance procedures in its plant. The problems that are encountered while introducing preventive maintenance and the paperwork that is necessary are discussed. It also highlights the possible savings that could be made by the introduction of preventive maintenance in a large ... More

  6. Voltamp Transformers Private Limited **

    Authors: Balachandra, R;

    Reference No: PROD0038 Pages: 3 Published on: 1, January, 1967

    Abstract: An actual situation is described to illustrate the application of line of balance technology. It could also be used as an exercise case. The discussion could be centered on the usefulness of line of balance technology in a manufacturing situation. ... More

  7. Kanvas Engineering Industries

    Authors: Balachandra, R;

    Reference No: PROD0041 Pages: 10 Published on: 1, January, 1967

    Abstract: The case describes a situation of deciding between alternative processes of manufacturing a particular part. Details about the methods of manufacture, the times involved and the cost are given so that a meaningful discussion about the relative merits of the alternative could be had. ... More

  8. Line of Balance Technology **

    Authors: Balachandra, R;

    Reference No: PROD0042TEC Pages: 8 Published on: 1, January, 1967

    Abstract: This note describes the line of balance technology in detail. A number of figures and charts are included to make the technique very clear. ... More

  9. Note on Quality Control and Product Reliability

    Authors: Balachandra, R;

    Reference No: PROD0043TEC Pages: 25 Published on: 1, January, 1967

    Abstract: This note explains the various techniques involved in quality control and product reliability. ... More

  10. Transport Services Corporation (A) **

    Authors: Krishnamachari, T D; Balachandra, R; Nambudiri, C N S;

    Reference No: PROD0045(A) Pages: 13 Published on: 1, January, 1967

    Abstract: The case describes a large maintenance depot of a transport organization and the maintenance schedules followed by the depot with respect to their fleet of buses. It also describes the detailed operations. Because of the restricted time available for the maintenance, the depot manager has to devise a method of ... More

  11. Transport Services Corporation (B) **

    Authors: Balachandra, R;

    Reference No: PROD0045(B) Pages: 4 Published on: 1, January, 1967

    Abstract: Describes the situation prevailing in the Transport Services Corporation after some improvements in maintenance methods have been introduced. It provides necessary data for simulating the queuing model, and for determining the bottlenecks and how these could be avoided. ... More

  12. Transport Services Corporation (C) **

    Authors: Balachandra, R;

    Reference No: PROD0047(C) Pages: 2 Published on: 1, January, 1967

    Abstract: The case gives information about the frequency of breakdowns occurring in a particular depot of the transport undertaking as also details about the time needed for repair. Students have to determine the optimum size of repair crews that should be maintained at the depot. ... More

  13. Dalal & Company **

    Authors: Balachandra, R;

    Reference No: PROD0056 Pages: 3 Published on: 1, January, 1968

    Abstract: This is an exercise in network construction. ... More

  14. Readywear Dress Manufacturing Company **

    Authors: Balachandra, R;

    Reference No: PROD0059 Pages: 8 Published on: 1, January, 1968

    Abstract: This is an introductory case that describes in general terms the basic elements of a production system as existing at facility of a mass producer of garments. ... More

  15. Prakash Plastics Company **

    Authors: Balachandra, R; Parameswaran, K V;

    Reference No: PROD0063 Pages: 11 Published on: 1, January, 1968

    Abstract: This is an integrated case about a small business enterprise that manufactures plastic consumer items. It provides sufficient scope for improving the company's production operations as well as for developing the strategy that should be followed by this company. ... More

Items 121 to 135 of 198

per page

My Cart

You have no items
in your shopping cart.