Reference No: PROD0165Pages: 3 Published on: 1, January, 1980
Abstract: Deals with the problems of acceptance sampling by attributes. It involves evaluation of some sampling inspection plans used for a transcription project, and design of an inspection plan for a pre?specified average outgoing quality limit, which will ensure minimum average Total Inspection. Rectifying Inspection is presupposed and the problem ... More
Reference No: OB0110Pages: 2Published on: 1, January, 1980
Abstract: Sometimes the formal behaviour of status?conscious bosses can have a high impact on the motivation of employees. An incident described here illustrates such insensitivity on the part of a boss to the needs of the subordinate and over sensitiveness to his own status and status symbols. Unknowingly, the boss ... More