Reference No: PROD0164Pages: 3Published on: 1, January, 1980
Abstract: The case deals with the design of an optimal preventive maintenance cycle for a machine with a pre?specified preventive maintenance schedule and breakdown pattern. The aim is to develop a cycle that will minimize expected cost of preventive maintenance and breakdown repairs per period. ... More
Reference No: CMA0527Pages: 11Published on: 1, January, 1980
Abstract: Presents the developmental and promotional role of institutional lending agencies in agricultural projects, and highlights the limitations of projects prepared by them at the formulation and implementation stages. ... More
Reference No: PROD0160Pages: 4Published on: 1, January, 1980
Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More
Reference No: PSG0001Pages: 10Published on: 1, January, 1981
Abstract: This case investigates the variables that characterize human relations in a PHC. It describes the functions and position of each official at the PHC level and their relationships, and traces the patterns of conflict and adjustment. ... More
Reference No: PSG0042Pages: 9Published on: 1, January, 1981
Abstract: The two cases analyze the contrasting profiles of a better performing community health volunteer and a poor performing community health volunteer. ... More
Reference No: F&A0350Pages: 2 Published on: 1, January, 1981
Abstract: The case deals with the problem of deciding which product is to be produced and which department is to operate in order to minimize cost. Although no probabilities are introduced, the full solution requires working out relationships of output quantities with input quantities and input prices. ... More