Reference No: CMA0520Pages: 2Published on: 1, January, 1980
Abstract: A non-official rural development agency took up a rural works programme in Pratappur block of Hazibagh district, Bihar, to create additional irrigation facilities through excavation and construction of tanks and check dams, and to provide wage employment to local unskilled labourers. A schedule of work was prepared on the assumption ... More
Reference No: PROD0160Pages: 4Published on: 1, January, 1980
Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More
Reference No: CMA0527Pages: 11Published on: 1, January, 1980
Abstract: Presents the developmental and promotional role of institutional lending agencies in agricultural projects, and highlights the limitations of projects prepared by them at the formulation and implementation stages. ... More
Reference No: PROD0167Pages: 2 Published on: 1, January, 1980
Abstract: This case deals with the production scheduling of multiple products using a single facility for production. Production rates are assumed to be very high compared to consumption rates. There is a major setup cost for the family of products scheduled and minor set up cost for individual products. The concept ... More
Reference No: F&A0341Pages: 3 Published on: 1, January, 1980
Abstract: Raises the issue of the impact on production when an item is repeatedly produced because of the increasing efficiency of workers due to learning (or experience). ... More
Reference No: QM0151Pages: 3Published on: 1, January, 1980
Abstract: This case is intended to introduce the relevance of linear programming models to short?term production decisions in the handloom sector. It also facilitates discussion of objectives that may be in conflict, such as employment maximization and profit maximization. ... More
Reference No: PROD0165Pages: 3 Published on: 1, January, 1980
Abstract: Deals with the problems of acceptance sampling by attributes. It involves evaluation of some sampling inspection plans used for a transcription project, and design of an inspection plan for a pre?specified average outgoing quality limit, which will ensure minimum average Total Inspection. Rectifying Inspection is presupposed and the problem ... More
Reference No: F&A0339(D)Pages: 32 Published on: 1, January, 1980
Abstract: Analyses, interprets and illustrates many aspects of the concepts and practices of financial management. The case facilitates discussion of: 1) conversion of a private limited company into a public limited company; 2) public issue; 3) stock exchange listing; 4) cost of capital; 5) capital expenditure planning; 6) capital structure planning; 7) analysis of business and financial risks ... More