Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
  2. Remove This Item Language: English
Sector
  1. Agriculture and Animal Husbandry (97)
  2. Banking Finance Insurance (BFI) (20)
  3. Cooperatives (41)
  4. Education (25)
  5. Government (113)
  6. Health (64)
  7. Infrastructure (38)
  8. Manufacturing (321)
  9. Mining (0)
  10. Miscellaneous (65)
  11. Public Sector (52)
  12. Telecom and Software (5)
  13. Trade (15)
  14. Transportation and Logistics (71)
Product Type
  1. Case (530)
  2. Exercise (4)
  3. Technical Note (137)

Latest published cases

List of Latest Published Cases

  1. An Approach to Mobilizing Rural Labour: Pratappur Project (Part I)

    Authors: Gupta, Ranjit;

    Reference No: CMA0520 Pages: 2 Published on: 1, January, 1980

    Abstract: A non-official rural development agency took up a rural works programme in Pratappur block of Hazibagh district, Bihar, to create additional irrigation facilities through excavation and construction of tanks and check dams, and to provide wage employment to local unskilled labourers. A schedule of work was prepared on the assumption ... More

  2. Economic Sampling Plan

    Authors: Korgaonker, M G;

    Reference No: PROD0166TEC Pages: 1 Published on: 1, January, 1980

    Abstract: This problem deals with the methodology of finding a minimum cost acceptance-sampling plan where the relevant costs are the cost of inspection and the cost of undetected defectives. Sampling is by attributes. ... More

  3. Planning the Product Mix at Panchatantra Corporation

    Authors: Patel, Nitin R; Anantaram, B;

    Reference No: QM0151 Pages: 3 Published on: 1, January, 1980

    Abstract: This case is intended to introduce the relevance of linear programming models to short?term production decisions in the handloom sector. It also facilitates discussion of objectives that may be in conflict, such as employment maximization and profit maximization. ... More

  4. Autoparts (Private) Limited

    Authors: Jaikumar, V;

    Reference No: F&A0341 Pages: 3 Published on: 1, January, 1980

    Abstract: Raises the issue of the impact on production when an item is repeatedly produced because of the increasing efficiency of workers due to learning (or experience). ... More

  5. Machines Are Down

    Authors: Korgaonker, M G;

    Reference No: PROD0164 Pages: 3 Published on: 1, January, 1980

    Abstract: The case deals with the design of an optimal preventive maintenance cycle for a machine with a pre?specified preventive maintenance schedule and breakdown pattern. The aim is to develop a cycle that will minimize expected cost of preventive maintenance and breakdown repairs per period. ... More

  6. Institutional Finance to Agricultural Projects

    Authors: Sah, D C; Ranade, C G;

    Reference No: CMA0527 Pages: 11 Published on: 1, January, 1980

    Abstract: Presents the developmental and promotional role of institutional lending agencies in agricultural projects, and highlights the limitations of projects prepared by them at the formulation and implementation stages. ... More

  7. The Pathway Criticals Limited I

    Authors: Korgaonker, M G;

    Reference No: PROD0160 Pages: 4 Published on: 1, January, 1980

    Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More

  8. Integrated Cotton Development Project in India

    Authors: Gupta, Tirath; Patel, G A; Ranade, C G;

    Reference No: CMA0525 Pages: 4 Published on: 1, January, 1980

    Abstract: The case presents problems arising out of multi-agency approach in a big project. ... More

  9. Long Term Production Planning at Panchatantra Corporation

    Authors: Patel, Nitin R; Anantaram, B;

    Reference No: QM0158 Pages: 2 Published on: 1, January, 1980

    Abstract: Considers the problem of annual production planning for a handloom development corporation. Despite having a large number of products, formulation leads to a knapsack problem that can be solved easily without a computer and has intuitive appeal. ... More

  10. Dakshin Rasayana Nigam Limited

    Authors: Govindarajan, V;

    Reference No: F&A0345 Pages: 5 Published on: 1, January, 1980

    Abstract: Deals with management control in a discretionary expense centre. The setting is the company's legal department. ... More

  11. Handloom Development and Bechara Weaver: A Shilpi Tale

    Authors: Gupta, Ranjit;

    Reference No: CMA0523 Pages: 32 Published on: 1, January, 1980

    Abstract: Shilpi, a research organization, conducted a study of the handloom development programme in the country. A review of the literature, including survey of a representative group of weavers, weaver cooperatives, and master weavers, was made to identify the problems of the weavers, the objectives and contents of the programme and ... More

  12. The Cycling Lots

    Authors: Korgaonker, M G;

    Reference No: PROD0167 Pages: 2 Published on: 1, January, 1980

    Abstract: This case deals with the production scheduling of multiple products using a single facility for production. Production rates are assumed to be very high compared to consumption rates. There is a major setup cost for the family of products scheduled and minor set up cost for individual products. The concept ... More

  13. V.S. General and Chinai Maternity Hospital

    Authors: Desai, P V; Govindarajan, V;

    Reference No: F&A0343 Pages: 11 Published on: 1, January, 1980

    Abstract: Deals with control problems in a non profit hospital. ... More

  14. Acceptance Sampling: An Application

    Authors: Narayanan, N; Korgaonker, M G; Kalro, A H;

    Reference No: PROD0165 Pages: 3 Published on: 1, January, 1980

    Abstract: Deals with the problems of acceptance sampling by attributes. It involves evaluation of some sampling inspection plans used for a transcription project, and design of an inspection plan for a pre?specified average outgoing quality limit, which will ensure minimum average Total Inspection. Rectifying Inspection is presupposed and the problem ... More

Items 361 to 375 of 721

per page

My Cart

You have no items
in your shopping cart.