Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
Language
  1. English (721)
  2. Hindi (5)
Sector
  1. Agriculture and Animal Husbandry (161)
  2. Banking Finance Insurance (BFI) (47)
  3. Cooperatives (54)
  4. Education (36)
  5. Government (178)
  6. Health (86)
  7. Infrastructure (58)
  8. Manufacturing (496)
  9. Mining (3)
  10. Miscellaneous (118)
  11. Public Sector (90)
  12. Telecom and Software (11)
  13. Trade (19)
  14. Transportation and Logistics (104)
Product Type
  1. Case (820)
  2. Exercise (27)
  3. Supplement (1)
  4. Technical Note (241)

Latest published cases

List of Latest Published Cases

  1. Applications of ABC Analysis in Inventory Management

    Authors: Shukla, P R;

    Reference No: PROD0152TEC Pages: 10 Published on: 1, January, 1980

    Abstract: ABC analysis is a basic tool for analysing the characteristics of a range of items at an aggregate level. In this note the applications of ABC analysis to two important areas of inventory management is considered:( 1 ) the estimation of aggregate inventory characteristics, and ( 2 ) designing individual item decision models using ABC ... More

  2. Reliance Textile Industries Limited (C)

    Authors: Kuchhal, S C; Pola, Kumaran;

    Reference No: F&A0339(C) Pages: 44 Published on: 1, January, 1980

    Abstract: Analyses, interprets and illustrates many aspects of the concepts and practices of financial management. The case facilitates discussion of: 1) conversion of a private limited company into a public limited company; 2) public issue; 3) stock exchange listing; 4) cost of capital; 5) capital expenditure planning; 6) capital structure planning; 7) analysis of business and financial risks ... More

  3. AFC Helps in Continuation of Lift Irrigation Schemes

    Authors: Ranade, C G; Sah, D C;

    Reference No: CMA0526 Pages: 13 Published on: 1, January, 1980

    Abstract: Outlines a state government's attempt to obtain refinance for continuation of a development scheme. The role of AFC as consulting organization has been discussed in the case. ... More

  4. Capacity and its Measurement

    Authors: Korgaonker, M G;

    Reference No: PROD0162TEC Pages: 4 Published on: 1, January, 1980

    Abstract: This note deals with the capacity measurement of a production system. Various factors influencing capacity are highlighted, and their effects on capacity measurement are discussed. ... More

  5. Development of Chaloda Village

    Authors: Srivastava, U K; Rao, Sreenivas S;

    Reference No: CMA0524 Pages: 10 Published on: 1, January, 1980

    Abstract: Discusses the uncertainties involved in providing tubewells in Chaloda village as a part of the developmental activities of a voluntary agency. Though, formal sources are available for financing the project, the farmers are not organized in getting the finances and managing the project. For want of data of the risk ... More

  6. The Pathway Criticals Limited I

    Authors: Korgaonker, M G;

    Reference No: PROD0160 Pages: 4 Published on: 1, January, 1980

    Abstract: Part I deals with basic computations in PERT network, namely: 1) computation of critical path, 2) expected time to complete the project, 3) probability of completing the project by specified due dates, and 4) manpower loading. Part II deals with the problem of resource levelling in projects under conditions of, 1) single resource requirement, and 2) ... More

  7. Mohan Private Limited

    Authors: Govindarajan, V;

    Reference No: F&A0344 Pages: 6 Published on: 1, January, 1980

    Abstract: Deals with control of working capital in a travel agency. ... More

  8. The Cycling Lots

    Authors: Korgaonker, M G;

    Reference No: PROD0167 Pages: 2 Published on: 1, January, 1980

    Abstract: This case deals with the production scheduling of multiple products using a single facility for production. Production rates are assumed to be very high compared to consumption rates. There is a major setup cost for the family of products scheduled and minor set up cost for individual products. The concept ... More

  9. An Approach to Mobilizing Rural Labour: Pratappur Project (Part I)

    Authors: Gupta, Ranjit;

    Reference No: CMA0520 Pages: 2 Published on: 1, January, 1980

    Abstract: A non-official rural development agency took up a rural works programme in Pratappur block of Hazibagh district, Bihar, to create additional irrigation facilities through excavation and construction of tanks and check dams, and to provide wage employment to local unskilled labourers. A schedule of work was prepared on the assumption ... More

  10. Production Requirement Planning

    Authors: Soundar Rajan, T K; Satia, J K;

    Reference No: PROD0158TEC Pages: 10 Published on: 1, January, 1980

    Abstract: This note basically deals with an overall production requirement planning. All aspects of production planning are viewed from an information systems viewpoint. A structure for production planning and control is formulated and the key decision areas are indicated. ... More

  11. Autoparts (Private) Limited

    Authors: Jaikumar, V;

    Reference No: F&A0341 Pages: 3 Published on: 1, January, 1980

    Abstract: Raises the issue of the impact on production when an item is repeatedly produced because of the increasing efficiency of workers due to learning (or experience). ... More

  12. Planning the Product Mix at Panchatantra Corporation

    Authors: Patel, Nitin R; Anantaram, B;

    Reference No: QM0151 Pages: 3 Published on: 1, January, 1980

    Abstract: This case is intended to introduce the relevance of linear programming models to short?term production decisions in the handloom sector. It also facilitates discussion of objectives that may be in conflict, such as employment maximization and profit maximization. ... More

  13. Acceptance Sampling: An Application

    Authors: Narayanan, N; Korgaonker, M G; Kalro, A H;

    Reference No: PROD0165 Pages: 3 Published on: 1, January, 1980

    Abstract: Deals with the problems of acceptance sampling by attributes. It involves evaluation of some sampling inspection plans used for a transcription project, and design of an inspection plan for a pre?specified average outgoing quality limit, which will ensure minimum average Total Inspection. Rectifying Inspection is presupposed and the problem ... More

Items 571 to 585 of 1146

per page

My Cart

You have no items
in your shopping cart.