Catalog Advanced Search

28 item(s) were found using the following search criteria
  • Authors: Shukla, P R

Don't see what you're looking for? Modify your search

per page
  1. Introductory Problems for Operations Scheduling

    Authors: Shukla, P R;

    Reference No: PROD0188TEC Pages: 3 Published on: 1, January, 1984

    Abstract: Discusses the introductory concepts for step scheduling and gives some illustrative problems. ... More

  2. Project Cost Control: Cost Estimating, Coding and Cost Accounting

    Authors: Shukla, P R;

    Reference No: PROD0189TEC Pages: 7 Published on: 1, January, 1984

    Abstract: Discusses the estimation of cost in project situations at various points in time. Also discusses coding to facilitate reporting and control of costs, and the cost accounting procedure for the project situation. ... More

  3. Organizing for Productivity and Implementing Productivity Programs at Shop Level

    Authors: Shukla, P R;

    Reference No: PROD0190TEC Pages: 5 Published on: 1, January, 1984

    Abstract: Describes an organization's experience in organizing the productivity programme. The technical and organizational aspects are dealt in the context of an engineering industry. The implementation of productivity programme is also discussed with the shop?level experience. ... More

  4. Ajit Engineers Limited

    Authors: Shukla, P R;

    Reference No: PROD0191 Pages: 6 Published on: 1, January, 1984

    Abstract: This case discusses the situation faced by an organization considering expansion. The expansion is to be done as a project, and affects land, machinery, manning, toolings, etc. The case discussion is centered on the uncertainties of the situation with the numerous products to be found in any engineering company. ... More

  5. Bharat Construction Company Limited (A)

    Authors: Shukla, P R;

    Reference No: PROD0192(A) Pages: 15 Published on: 1, January, 1984

    Abstract: The case can be used to discuss the management control system in a new project. An existing MCS for a large construction company is described and management problems faced by the company in handling a new project are highlighted. The new MCS that can be suitable for the situation can ... More

  6. Industrial Planning Corporation of India

    Authors: Tripathy, Arabinda; Shukla, P R; Seshadri, D V R;

    Reference No: PROD0193 Pages: 57 Published on: 1, January, 1984

    Abstract: The case focuses on the problem of location of sponge iron plants in India. Sponge iron being a virgin industry, planners face a real problem in licensing such plants, keeping in view the growth of the industry over the next fifteen to twenty years. The case presents such issues as ... More

  7. Bharat Construction Company Limited (B)

    Authors: Shukla, P R; Gandhi, Shailesh;

    Reference No: PROD0192(B) Pages: 12 Published on: 1, January, 1985

    Abstract: The case can be used for discussing an effective management control system for projects. Aspects such as selection of project team, preparation of network diagrams, budgeting, activity planning at the site, coding, reporting, etc can be discussed. ... More

  8. Indian Farmers' Fertilizer Cooperative Limited: Aonla Project and the HBJ Pipeline

    Authors: Shukla, P R; Tripathy, Arabinda; Thomas, P S;

    Reference No: PROD0195(A) Pages: 31 Published on: 1, January, 1985

    Abstract: In 1984, IFFCO was invited by the Government of India to establish a gas?based fertilizer plant on the Hazira? Bijyapur?Jagdishpur pipeline. The case describes the company's Aonla Project and the steps taken by IFFCO's project staff to implement it. Information about the pipeline project is also given along with ... More

  9. Navabharat Electricals Limited

    Authors: Shukla, P R;

    Reference No: PROD0198 Pages: 13 Published on: 1, January, 1985

    Abstract: This case can be used for discussion on issues on production scheduling aggregate planning, step loading, product mix, etc. Scheduling procedure and problems due to uncertainties in scheduling process can be highlighted. ... More

  10. Simplex Industries Limited

    Authors: Shukla, P R;

    Reference No: PROD0199 Pages: 6 Published on: 1, January, 1985

    Abstract: This case can be used for discussing the incentive scheme of direct workers. The incentive bonus compositions can be highlighted. The discussion can also be focused on setting up a new incentive scheme in an upcoming department. ... More

  11. Fertilizer Industry

    Authors: Shukla, P R; Tripathy, Arabinda; Sharma, R R K;

    Reference No: PROD0200TEC Pages: 16 Published on: 1, January, 1987

    Abstract: Gives information on fertilizer industry together with various data pertaining to fertilizers. Both Indian and international developments in the fertilizer industry are outlined. ... More

  12. Despatch Planning of Finished Steel Products at a Steel Plant

    Authors: Kalro, A H; Shukla, P R; Tripathy, Arabinda; Raghuram, G;

    Reference No: PROD0220 Pages: 23 Published on: 1, January, 1989

    Abstract: The problem considered here is that of planning despatches of finished steel at Bhilai Steel Plant (BSP). The despatch decisions have a strong impact on the fluidity of the finished steel loading area and on the formation of rake load shipments for various destinations. The despatch decision (also called as ... More

Items 16 to 28 of 28

per page

My Cart

You have no items
in your shopping cart.