Filter By

Currently Shopping by:

  1. Remove This Item Discipline: Operations Management
  2. Remove This Item Language: English
Sector
  1. Agriculture and Animal Husbandry (97)
  2. Banking Finance Insurance (BFI) (20)
  3. Cooperatives (41)
  4. Education (25)
  5. Government (113)
  6. Health (64)
  7. Infrastructure (38)
  8. Manufacturing (321)
  9. Mining (0)
  10. Miscellaneous (65)
  11. Public Sector (52)
  12. Telecom and Software (5)
  13. Trade (15)
  14. Transportation and Logistics (71)
Product Type
  1. Case (530)
  2. Exercise (4)
  3. Technical Note (137)

Most Popular cases

List of Most Popular Cases

  1. V.S. General and Chinai Maternity Hospital

    Authors: Desai, P V; Govindarajan, V;

    Reference No: F&A0343 Pages: 11 Published on: 1, January, 1980

    Abstract: Deals with control problems in a non profit hospital. ... More

  2. Long Term Production Planning at Panchatantra Corporation

    Authors: Patel, Nitin R; Anantaram, B;

    Reference No: QM0158 Pages: 2 Published on: 1, January, 1980

    Abstract: Considers the problem of annual production planning for a handloom development corporation. Despite having a large number of products, formulation leads to a knapsack problem that can be solved easily without a computer and has intuitive appeal. ... More

  3. The Cycling Lots

    Authors: Korgaonker, M G;

    Reference No: PROD0167 Pages: 2 Published on: 1, January, 1980

    Abstract: This case deals with the production scheduling of multiple products using a single facility for production. Production rates are assumed to be very high compared to consumption rates. There is a major setup cost for the family of products scheduled and minor set up cost for individual products. The concept ... More

  4. Acceptance Sampling: An Application

    Authors: Narayanan, N; Korgaonker, M G; Kalro, A H;

    Reference No: PROD0165 Pages: 3 Published on: 1, January, 1980

    Abstract: Deals with the problems of acceptance sampling by attributes. It involves evaluation of some sampling inspection plans used for a transcription project, and design of an inspection plan for a pre?specified average outgoing quality limit, which will ensure minimum average Total Inspection. Rectifying Inspection is presupposed and the problem ... More

  5. AFC Helps in Continuation of Lift Irrigation Schemes

    Authors: Ranade, C G; Sah, D C;

    Reference No: CMA0526 Pages: 13 Published on: 1, January, 1980

    Abstract: Outlines a state government's attempt to obtain refinance for continuation of a development scheme. The role of AFC as consulting organization has been discussed in the case. ... More

  6. Development of Chaloda Village

    Authors: Srivastava, U K; Rao, Sreenivas S;

    Reference No: CMA0524 Pages: 10 Published on: 1, January, 1980

    Abstract: Discusses the uncertainties involved in providing tubewells in Chaloda village as a part of the developmental activities of a voluntary agency. Though, formal sources are available for financing the project, the farmers are not organized in getting the finances and managing the project. For want of data of the risk ... More

  7. Mohan Private Limited

    Authors: Govindarajan, V;

    Reference No: F&A0344 Pages: 6 Published on: 1, January, 1980

    Abstract: Deals with control of working capital in a travel agency. ... More

  8. An Approach to Mobilizing Rural Labour: Pratappur Project (Part I)

    Authors: Gupta, Ranjit;

    Reference No: CMA0520 Pages: 2 Published on: 1, January, 1980

    Abstract: A non-official rural development agency took up a rural works programme in Pratappur block of Hazibagh district, Bihar, to create additional irrigation facilities through excavation and construction of tanks and check dams, and to provide wage employment to local unskilled labourers. A schedule of work was prepared on the assumption ... More

  9. Autoparts (Private) Limited

    Authors: Jaikumar, V;

    Reference No: F&A0341 Pages: 3 Published on: 1, January, 1980

    Abstract: Raises the issue of the impact on production when an item is repeatedly produced because of the increasing efficiency of workers due to learning (or experience). ... More

  10. The Complex Line

    Authors: Korgaonker, M G;

    Reference No: PROD0168 Pages: 4 Published on: 1, January, 1980

    Abstract: Deals with the problem of balancing assembly lines under variable element times and seasonal, fluctuating demand requirements. ... More

  11. Institutional Finance to Agricultural Projects

    Authors: Sah, D C; Ranade, C G;

    Reference No: CMA0527 Pages: 11 Published on: 1, January, 1980

    Abstract: Presents the developmental and promotional role of institutional lending agencies in agricultural projects, and highlights the limitations of projects prepared by them at the formulation and implementation stages. ... More

Items 361 to 375 of 721

per page

My Cart

You have no items
in your shopping cart.